MAXIMA - Roma
Projekt MAXIMA, usytuowany w sercu wiecznego miasta Rzymu, to przedsięwzięcie prowadzone przez nasze powiązane studio IT’S VISION. W tej wspólnej pracy Parallel Digital podjął pełną odpowiedzialność za wszystkie aspekty związane ze środowiskiem BIM. Realizowany przy ulicy Amba Aradam, nasze zaangażowanie obejmowało staranne przygotowanie i nadzór nad pracą w programie Revit na każdym etapie projektu. Obejmowało to zadania począwszy od stworzenia cyfrowego bliźniaka opartego na chmurze punktów laserowych, aż po rozwinięcie szczegółowych rysunków wykonawczych.
Project details
Location: Rome
Client: Cromwell Property Group
Assignment: Private invitation-only competition. Comprehensive mandate.
Area: 18,600 sqm
Budget: €40,000,000
Timeline: Ongoing – 2024
Certification: LEED PLATINUM® and WELL GOLD®
Team: Architect: IT’S BIM Management: Parallel Digital Construction Management: Artelia Structural Engineering: Genia Ingegneria Mechanical and Electrical Engineering: F&M Ingegneria Landscape Design: OSA Acoustic Design: Diapason Ingegneria LEED and Well Certification: OGB Studio Administrative Manager: Piùtrentanovesei Fire Safety Consultant: Studio Mattei Archaeologist: Michela Rustici Lighting Design: Artec Surveying: IANUS
Throughout the entire project process, we leveraged advanced Dynamo scripts for calculations and information management, significantly enhancing the model's quality and expediting the pace of work. A significant challenge was the creation of scripts facilitating the allocation of codes for project cost estimations. These scripts had to intricately understand the features of project elements. The entire project was executed within the Revit program, encompassing collaboration with subcontractors for plumbing, construction, electrical work, etc. Model compatibility greatly facilitated seamless data sharing and exchange among stakeholders. Our task also involved interdisciplinary coordination, with continuous collision checks conducted on all models. This undoubtedly will reduce costs incurred by errors during construction or unforeseen clashes between different industry components.

